Monday, March 28, 2011

Top Duro-Last Installation Scores - Making the Grade


How does DK Haney Roofing continue to receive top installation scores?

Over the past 12 years DK Haney Roofing has specialized in Duro-Last single-ply roofing membrane.  Each member of our Duro-Last crew has over 5 years of experience installing the Duro-Last Roofing System.

John Bell, our newest Duro-Last foreman uses the below tips to help his crew install a top rated Duro-Last roof:
 
Think Ahead
Before we start any job we go over the roof and make sure that nothing has changed since the roof was first inspected by one of our technicians.  Once debris is cleared, we survey the roof and come up with a plan for loading and prepping the roof.  Our material is then loaded in the areas we are going to use them. 

Team Work
At the beginning of each day everyone on the crew knows what they are responsible for and knows what they need to have completed by the end of that day.  If someone needs help with something or a problem needs to be solved we work as a team to get it done. 

Double Check
At DK Haney Roofing we double check all our welds before we have the roof inspected.  This way we can catch any lose welds before we call the project complete.  That means that all DK Haney Roofing welds are checked 3 times.

By following these simple tips DK Haney Roofing has risen to Master Elite Contractor and is one of the top Duro-Last® contractors in the country.

Learn more about how we install the Duro-Last Roofing System by watching our Demo Video.

No comments:

Post a Comment